Maintenance Impact on Geothermal Drilling Operations. A Case Study Approach
- 1 Department of Mechanical Engineering, Dedan Kimathi University of Technology, Nyeri, Kenya
- 2 Department of Mechanical Engineering, Dedan Kimathi University of Technology, Nyeri, Kenya
- 3 Department of Mechanical Engineering, Dedan Kimathi University of Technology, Nyeri, Kenya
- 4 Centre of Industrial Management/Traffic and Infrastructure, KU Leuven, Heverlee, Belgium
Abstract
This paper develops a simulation-based model to derive critical maintenance parameters towards optimizing a deep drilling rig availability and maintenance costs. Full factorial analysis is performed to derive the effects and interactions of the derived parameters, based on which ones with a significant effect on the availability and maintenance cost are selected. The case study based model incorporates maintenance, spares and workforce strategies for a geothermal drilling rig. The results offer essential maintenance decision support to both the management and maintenance team of the company and have the potential of further offering insights that eventually reduce the cost of drilling.
- Alfares, H. K. (2003). Flexible 4-Day Workweek Scheduling with Weekend Work Frequency Constraints. Computers and Industrial Engineering, 44, 325-338. https://doi.org/10.1016/S0360-8352(02)00192-4
- Alshareef, A., & Saber, A. Y. (2018). An Application of Particle Swarm Optimization (PSO) to Dynamic Unit Commitment Problem for the Western Area of Saudi Arabia. JKAU, 29, 21-32.
- Al-Shayea, A. M. (2012). Maintenance Capacity Planning: Determination of Maintenance Workforce. Engineering, 4, 37-43. https://doi.org/10.4236/eng.2012.41006
- Bouslah, B., Gharbi, A., & Pellerin, R. (2018). Joint Production, Quality and Maintenance Control of a Two-Machine Line Subject to Operation-Dependent and Quality-Dependent Failures. International Journal of Production Economics, 195, 210-226. https://doi.org/10.1016/j.ijpe.2017.10.016
- Czitrom, V. (1999). One-Factor-at-a-Time versus Designed Experiments. The American Statistician, 53, 126-131. https://doi.org/10.1080/00031305.1999.10474445
- Dhillon, B. S. (2002). Engineering Maintenance: A Modern Approach. Boca Raton, FL: CRC Press. https://doi.org/10.1201/9781420031843
- Dijoux, Y., Fouladirad, M., & Nguyen, D. T. (2016). Statistical Inference for Imperfect Maintenance Models with Missing Data. Reliability Engineering & System Safety, 154, 84-96. https://doi.org/10.1016/j.ress.2016.05.017
- Elevli, S., & Elevli, B. (2010). Performance Measurement of Mining Equipments by Utilizing OEE. Acta Montanistica Slovaca, 15, 95-101.
- Emovon, I., Lilly, M. T., & Ogaji, S. O. T.-O. (2012). Design of Software for Maintenance Workforce Scheduling (A Case Study of Afam Power Station, Nigeria). Engineering, 4, 235-244. https://doi.org/10.4236/eng.2012.45031
- ISO 14224 (2016). Petroleum, Petrochemical and Natural Gas Industries—Collection and Exchange of Reliability and Maintenance Data for Equipment (ISO 14224:2016). British Standards Institution.
- Jia, C., & Zhang, C. (2020). Joint Optimization of Maintenance Planning and Workforce Routing for a Geographically Distributed Networked Infrastructure. IISE Transactions, 52, 732-750. https://doi.org/10.1080/24725854.2019.1647478
- Kansake, B. A., & Suglo, R. S. (2015). Impact of Availability and Utilisation of Drill Rigs on Production at Kanjole Minerals Limited. International Journal of Science, Environment and Technology, 4, 1524-1537.