Abstract
Water is one of the developments that Vietnamese government has already committed and this sector always plays an important role in socio-economic life of Vietnam. The Government and Vietnamese people have been trying to improve infrastructure, enhance living standards for people and national socio-economic development. However, in terms of water, Vietnam still has to face many challenges that require a lot of efforts to deal with. Now, in Hanoi, especially the outskirts of the city, there is a huge lack of water works, causing negative impacts on community’s life and the quality of environment. Water distribution systems play a critical role in supplying sufficient water to users with acceptable quantity, pressure, and quality. Risk assessment has been recognized as a useful tool to identify the hazard, analyse vulnerabilities, and risks, and select proper mitigation measures. A questionnaire has been designed including 51 factors that create risk events that can occur during construction works implementation. Risk matrix was used as basis for quantitative risk analysis to determine the most critical risks which were a great impact on project and also to indicate moderate risks that must be taken into consideration. The study analysis and assessment of risks are based on survey questionnaires, which achieved the following findings: 1) there are 26 main risks influencing schedule delays; 2) scientifically ranks influence every single risk on schedule delays; 3) making recommendations can reduce or eliminate influencing factors. This study provides a valuable reference which helps investors and contractors finish on schedule to ensure the benefits when building the Water Supply Projects.
- Abd, A. M. (2015). Building Projects Risks Sources: Conceptual Fuzzy Assessment Approach. International Journal of Engineering Sciences & Research Technology, 4, 325-332.
- Bagaya, O., & Song, J. (2016). Empirical Study of Factors Influencing Schedule Delays of Public Construction Projects in Burkina Faso. Journal of Management in Engineering, 32, Article ID: 05016014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000443
- Chan, A. P., Lam, P. T., Wen, Y., Ameyaw, E. E., Wang, S., & Ke, Y. (2014). Cross-Sectional Analysis of Critical Risk Factors for PPP Water Projects in China. Journal of Infrastructure Systems, 21, Article ID: 04014031. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000214
- Doloi, H., Sawhney, A., Iyer, K., & Rentala, S. (2012). Analysing Factors Affecting Delays in Indian Construction Projects. International Journal of Project Management, 30, 479-489. https://doi.org/10.1016/j.ijproman.2011.10.004
- Ge, S. J., & Shi, A. N. (2014). Construction of the Factors Affecting China’s Hydropower Projects and Overseas Investment Risk Assessment Index System. Applied Mechanics and Materials, 672, 2077-2084. https://doi.org/10.4028/www.scientific.net/AMM.672-674.2077
- Gerbing, D. W., & Anderson, J. C. (1988). An Updated Paradigm for Scale Development Incorporating Unidimensionality and Its Assessment. Journal of Marketing Research, 25, 186-192. https://doi.org/10.1177/002224378802500207
- Gündüz, M., Nielsen, Y., & Ö;zdemir, M. (2013). Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey. Journal of Management in Engineering, 29, 133-139. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000129
- Hair, J. F., Black, W. C., Babin, B. J., Anderson, R. E., & Tatham, R. L. (2009). Análise Multivariada de Dados. Editora: Bookman.
- Liu, D., & Song, H. (2010). Risk Analysis and Comprehensive Evaluation of Risks in EPC Hydropower Engineering. Water Sciences and Engineering Technology, 1, 74-76.
- Marzouk, M. M., & El-Rasas, T. I. (2014). Analyzing Delay Causes in Egyptian Construction Projects. Journal of Advanced Research, 5, 49-55. https://doi.org/10.1016/j.jare.2012.11.005
- McCord, J., McCord, M., Davis, P. T., Haran, M., & Rodgers, W. J. (2015). Understanding Delays in Housing Construction: Evidence from Northern Ireland. Journal of Financial Management of Property and Construction, 20, 286-319. https://doi.org/10.1108/JFMPC-07-2015-0028