Variation orders have been identified globally as important reasons for the poor performance of construction projects in most countries, which has affected their national economic growth. Several variation orders have been identified in the Jordanian construction industry; however, there is a paucity of information on the approaches to minimize their occurrence. Therefore, administrative practices to reduce the negative impact of variation orders in the construction sector in Jordan are highly required. To achieve the objective of the current study, the researchers used the quantitative approach to a structured questionnaire consisting of 10 administrative policies to reduce the negative impact of variation orders. A total of 161 questionnaires were collected against 250 questionnaires distributed among engineers in construction projects. According to the findings of the study, the top five policies for minimizing variation orders include: all involved parties require audit planning before works start on site; ensure that the drawings conform to the required specifications; the owner must be informed of the designs before bidding; checking the specifications required in the contract; effective communication between all parties concerned during the entire stages of the project. Moreover, proper planning before starting the project greatly contributes to reducing potential variation orders. The findings of this research, therefore, contribute to a pool of knowledge that will enable practitioners and researchers in the construction industry to develop effective strategies for minimizing variation orders.
Albtoosh, H. A. M. (2020). Tenders’ Administration Policies Improvement on Reducing Negative Impact of Variation Orders on Construction Projects. MS Thesis, Jordan: Mutah University.
Arain, F. M., & Pheng, L. S. (2005). The Potential Effects of Variation Orders on Institutional Building Projects. Facilities, 23, 496-510.
Arain, F. M., Assaf, S., & Pheng, L. S. (2004). Causes of Discrepancies between Design and Construction. Architectural Science Review, 47, 237-249. https://doi.org/10.1080/00038628.2000.9697530
Chileshe, N., & Yirenkyi-Fianko, A. B. (2012). An Evaluation of Risk Factors Impacting Construction Projects in Ghana. Journal of Engineering, Design and Technology, 10, 306-329. https://doi.org/10.1108/17260531211274693
CII (1994). Project Change Management. Special Publication 43-1, Austin, TX: Construction Industry Institute, University of Texas at Austin.
Clough, R. H., Sears, G. A., Sears, S. K., Segner, R. O., & Rounds, J. L. (2015). Construction Contracting: A Practical Guide to Company Management. Hoboken, NJ: John Wiley & Sons.
Enshassi, A., Mohamed, S., & Abushaban, S. (2009). Factors Affecting the Performance of Construction Projects in the Gaza Strip. Journal of Civil Engineering and Management, 15, 269-280. https://doi.org/10.3846/1392-3730.2009.15.269-280
Famiyeh, S., Amoatey, C. T., Adaku, E., & Agbenohevi, C. S. (2017). Major Causes of Construction Time and Cost Overruns. Journal of Engineering, Design and Technology, 15, 181-198. https://doi.org/10.1108/JEDT-11-2015-0075
Fisk, E. R. (1997). Construction Project Administration (5th ed.). Upper Saddle River, NJ: Prentice Hall.
Fisk, E. R., & Reynolds, W. D. (1988). Construction Project Administration (10th ed.). USA: Wiley.
Construction Industry Institute Cost/Schedule Controls Task Force (1990). The Impact of Changes on Construction Cost and Schedule (Vol. 6). Austin, TX: Institute, University of Texas at Austin.
Gray, C., & Hughes, W. (2007). Building Design Management. London: Routledge. https://doi.org/10.4324/9780080500409
Günhan, S., Arditi, D., & Doyle, J. (2007). Avoiding Change Orders in Public School Construction. Journal of Professional Issues in Engineering Education and Practice, 133, 67-73. https://doi.org/10.1061/(ASCE)1052-3928(2007)133:1(67)
Hayes, J. (2018). The Theory and Practice of Change Management. UK: Palgrave.
Hester, W., Kuprenas, J., & Chang, T. (1991). Construction Changes and Change Orders, Source Document 66. Austin, TX: Construction Industry Institute.
Ibbs, C. W., Wong, C. K., & Kwak, Y. H. (2001). Project Change Management System. Journal of Management in Engineering, 17, 159-165. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:3(159)
Jarkas, A. M., & Haupt, T. C. (2015). Major Construction Risk Factors Considered by General Contractors in Qatar. Journal of Engineering, Design and Technology, 13, 165-194. https://doi.org/10.1108/JEDT-03-2014-0012
Keane, P., Sertyesilisik, B., & Ross, A. D. (2010). Variations and Change Orders on Construction Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2, 89-96. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000016
Le, N. T. K. (2019). Identification of Risk Factors, Success Practices, and Feasibility of the Best Value Approach Application to Improve Construction Performance in Vietnam and Other Developing Countries. Tempe, AZ: Arizona State University.
Mashwama, X., Aigbavboa, C., & Thwala, D. (2016). Investigation of Construction Stakeholders’ Perception on the Effects & Cost of Construction Dispute in Swaziland. Procedia Engineering, 164, 196-205. https://doi.org/10.1016/j.proeng.2016.11.610
Megha, D., & Rajiv, B. (2013). A Methodology for Ranking of Causes of Delay for Residential Construction Projects in Indian Context. International Journal of Emerging Technology and Advanced Engineering, 3, 396-404.
Memon, A. H., Rahman, I. A., & Hasan, M. F. A. (2014). Significant Causes and Effects of Variation Orders in Construction Projects. Research Journal of Applied Sciences, Engineering and Technology, 7, 4494-4502. https://doi.org/10.19026/rjaset.7.826
Mohammad, N., Ani, A. I. C., & Rakmat, R. A. O. (2017). Causes and Effects of Variation Orders in the Construction of Terrace Housing Projects: A Case Study in the State of Selangor, Malaysia. International Journal of Supply Chain Management, 6, 226-232.
Nassar, S. R. (2017). Management of Variation Orders in Gaza Strip: Impacts and Minimization. Gaza: The Islamic University of Gaza.
O’Brien, W. J. (1998). Capacity Costing Approaches for Construction Supply-Chain Management. Ph.D. thesis, California: Sanford University.
Ofori, G. (2012). Developing the Construction Industry in Ghana: The Case for a Central Agency (pp. 3-18). A Concept Paper Prepared for Improving the Construction Industry in Ghana. Singapore: National University of Singapore.
Oladapo, A. (2007). A Quantitative Assessment of the Cost and Time Impact of Variation Orders on Construction Projects. Journal of Engineering, Design and Technology, 5, 35-48. https://doi.org/10.1108/17260530710746597
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992). Critical Success Factors for Construction Projects. Journal of Construction Engineering and Management, 118, 94-111. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(94)
Singh, A. P., & Singh, R. (2017). Ranking Delay, Cost, Quality Factors for Project Success in Real Estate Companies. International Journal of Latest Trends in Engineering and Technology, 8, 273-287. https://doi.org/10.21172/1.841.45
Thomas, H. R., & Napolitan, C. L. (1995). Quantitative Effects of Construction Changes on Labor Productivity. Journal of Construction Engineering and Management, 121, 290-296. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:3(290)
Wang, Y. (2000). Coordination Issues in Chinese Large Building Projects. Journal of Management in Engineering, 16, 54-61. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:6(54)
Wanjari, S. P., & Dobariya, G. (2016). Identifying Factors Causing Cost Overrun of the Construction Projects in India. Sādhanā, 41, 679-693. https://doi.org/10.1007/s12046-016-0498-3
Yeung, P. (2014). SPSS Survival Manual. A Step by Step Guide to Data Analysis Using IBM SPSS [Book Review]. Aotearoa New Zealand Social Work, 26, 92.