Deployment of Lean Six Sigma and KAIZEN Techniques: A Case Study of the Concrete Production Plant for the 750 MW (5 * 150 MW) Kafue Gorge Lower Hydro Power Project
- 1 Powerhouse, Main Crusher and Batching Plant, Sinohydro Bureau 11 Cor., Ltd., Kafue Gorge Lower Hydropower Station Project, Lusaka, Republic of Zambia
- 2 Sinohydro Bureau 11 Cor., Ltd., Kafue Gorge Lower Hydropower Station Project, Lusaka, Republic of Zambia
Abstract
With the fourth industrial revolution on the verge of disruption, businesses and production companies around the world are trying to emulate the success of Toyota’s remarkable production system with a view of reducing waste and im proving quality. Lean production has been the secret for Toyota to b e as the most profitable automaker in the world. This paper presents a survey and reviews on how process improvement techniques such as the Lean Six Sigma (LSS) and KAIZEN may be implemented to realize reduced lead time in production processes and to attain the desired quality in concrete. The case study is based on the concrete production plant for the 750 MW (5 * 150 MW) Kafue Gorge Lower Hydro Power Project, which may be considered to have been one of the largest concrete batching plant with a total production capacity of 32 cubic meters. The analysis of the effectiveness and impact of the operation and management methods, i.e. , LSS and KAIZEN techniques, were carried out over a period of approximately two years. Through literature review, evaluation of these philosophies was done by first defining waste in materials, time and work force at the concrete production plant. The KAIZEN, which is management techniques focusing on employees’ involvement to ensure continuous improvement and a high success rate of lean implementation at the plant, was applied and used thus creating a feedback kind of plant management technique review mechanism overtime. The complete implementation of the lean production system involves considerable organizational change while maintaining the true north. Furthermore, not only can these methods be used to realize Industrial Value Chain through lead time reduction and quality optimization of concrete but also provides applied management and economical improvements with assured reduced Takt-Time realization at the production plant.
- Allampallewar, S. B., & Sathe, S. (2017). Application of Six Sigma in Construction. International Journal of Innovative Research in Science, Engineering and Technology, 6, 21839-21845.
- Ashtankar, V. B., & Chore, H. S. (2014). Development of Design Mix Roller Compacted Concrete Dam at Middle Vaitarana. Advances in Concrete Construction, 2, 125-144. https://doi.org/10.12989/acc.2014.2.2.125
- Bank, R. K. (2003). Roller Compacted Concrete (RCC) Dams for Tropical Conditions. Department of Civil Engineering India Institute of Technology Roorkee.
- Bhattarai, M., Saporiti, N., & Trouille, B. (2010). Feasibility Study of the Kafue Gorge Lower. International Hydropower Association.
- Fletcher, P. (2016). The Fourth Industrial Revolution and the Built Environment. BLP Insurance.
- George, M. L. (2003). Lean Six Sigma for Service. McGraw-Hill Companies, Inc.
- Go Lean Six Sigma (2012). Go Lean Six Sigma. https://www.goleansixsigma.com/
- Hazaree, V. C. (2007). Transport Properties and Freeze-Thaw Resistance of Roller Compacted Concrete (RCC) for Pavement Applications. Iowa State University.
- Li, Z. W. (2019). Training Course on Hydropower Operation and Management in Zambia: Dam Design and Construction. Kafue Gorge Lower, Republic of Zambia, Hangzhou regional (Asia & Pacific) Center for Small Hydropower.
- Liker, J. K. (2004). The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer. McGraw-Hill.
- Ministry of Energy and Water Development (2011). Power System Development Master Plan for Zambia [2010-2030]. Ministry of Energy and Water Development, Republic of Zambia.
- Nkumbwa, R. L. (2009). Engineers as Managers. Copperbelt Unversity.
- Sarathkumar, K., & Loganathan, R. (2016). Evaluation of Six Sigma Concepts in Construction Industry. International Journal of Scientific & Engineering Research, 7, 202-207.
- Stenek, V., & Boysen, D. (2011). Climate Risk and Business: Hydropower, Kafue Gorge Lower. International Finance Corporation.
- Titu, M. A., Oprean, C., & Grecu, D. (2010). Applying the Kaizen Method and the 5S Technique in the Activity of Post-Sale Services in the Knowledge-Based Organization. Proceedings of the International MultiConference of Engineers and Computer Scientists, Hong Kong, 17-19 March 2010.