The Phenomenal Alleviation of Transmission Congestion by Optimally Placed Multiple Distributed Generators Using PSO
- 1 Department of Electrical and Electronics Engineering, Kamaraj College of Engineering and Technology, Virudhunagar, India
- 2 Department of Electrical and Electronics Engineering, Anna University Regional Campus Madurai, Madurai, India
- 3 Department of Electrical and Electronics Engineering, Thiagarajar College of Engineering, Madurai, India
Abstract
In the current electricity paradigm, the rapid elevation of demands in industrial sector and the process of restructuring are the main causes for the overuse of transmission systems. Hence, the evolution of novel technology is the ultimate need to avoid the damages in the available transmission systems. An appreciable volume of renewable energy sources is used to produce electric power, after the implementation of deregulation in power system. Even though, they are intended to improve the reliability of power system, the unpredictable outages of generators or transmission lines, an impulsive increase in demand and the sudden failures of vital equipment cause transmission congestion in one or some transmission lines. Generation rescheduling and load shedding can be used to alleviate congestion, but some cases require quite few improved methods. With the extensive application of Distributed Generation (DG), congestion management is also performed by the optimal placement of DGs. Therefore, this research employs a Line Flow Sensitivity Factor (LFSF) and Particle Swarm Optimization (PSO) for the determination of optimal location and size of multiple DG units, respectively. This proposed problem is formulated to minimize the total system losses and real power flow performance index. This approach is experimented in modified IEEE-30 bus test system. The results of N-1 contingency analysis with DG units prove the competence of this proposed approach, since the total numbers of congested lines get reduced from 15 to 2. Hence, the results show that the proposed approach is robust and simple in alleviating transmission congestion by the optimal placement and sizing of multiple DG units.
- Kumar, A., Srivastava, S.C. and Singh, S.N. (2005) Congestion Management in Competitive Power Market: A Bibliographical Survey. Electric Power Systems Research, 76, 153-164. http://dx.doi.org/10.1016/j.epsr.2005.05.001
- Kumar, A., Srivastava, S.C. and Singh, S.N. (2004) A Zonal Congestion Management Approach Using Real and Reactive Power Rescheduling. IEEE Transactions on Power Systems, 19, 554-562.
- Talukdar, B.K., Sinhaa, A.K., Mukhopadhyay, S. and Bose, A. (2005) A Computationally Simple Method for Cost- Efficient Generation Rescheduling and Load Shedding for Congestion Management. International Journal of Electric Power & Energy Systems, 27, 379-388.
- Conejo, A. J., Milano, F. and García-Bertrand, R. (2006) Congestion Management Ensuring Voltage Stability. IEEE Transactions on Power Systems, 21, 357-364. http://dx.doi.org/10.1109/TPWRS.2005.860910
- Dutta, S. and Singh, S.P. (2008) Optimal Rescheduling of Generators for Congestion Management Based on Particle Swarm Optimization. IEEE Transactions on Power Systems, 23, 1560-1568. http://dx.doi.org/10.1109/TPWRS.2008.922647
- Muthulakshmi, K. and Babulal, C.K. (2014) Relieving Transmission Congestion by Optimal Rescheduling of Generators Using PSO. Applied Mechanics and Materials, 626, 213-218. www.scientific.net/AMM.626.213
- Hingorani, N.G. and Gyugyi, L. (2000) Understanding FACTS. Concepts and Technology of Flexible AC Transmission Systems. IEEE Press, New York.
- Brosda, J. and Handschin, E. (2001) Congestion Management Methods with Special Consideration of FACTS Devices. IEEE International Conference on Power Techniques, Vol. 1, Porto, 10-13 September 2001. http://dx.doi.org/10.1109/PTC.2001.964593
- Besharat, H. and Taher, S.A. (2008) Congestion Management by Determining Optimal Location of TCSC in Deregulated Power Systems. International Journal of Electric Power & Energy Systems, 30, 563-568. http://dx.doi.org/10.1016/j.ijepes.2008.08.007
- Acharya, N. and Mithulananthan, N. (2007) Locating Series FACTS Devices for Congestion Management in Deregulated Electricity Markets. Electric Power Systems Research, 77, 352-360. http://dx.doi.org/10.1016/j.epsr.2006.03.016
- Singh, K., Padhy N.P. and Sharma, J. (2011) Congestion Management Considering Hydro-Thermal Combined Operation in a Pool Based Electricity Market. International Journal of Electric Power & Energy Systems, 33, 1513-1519. http://dx.doi.org/10.1016/j.ijepes.2011.06.037