Research on Cost Overrun Risk of Construction Phase of Vietnam Highway International Contracting Project
- 1 School of Economics and Management, Southwest Jiaotong University, Chengdu, China
- 2 School of Economics and Management, Southwest Jiaotong University, Chengdu, China
- 3 School of Management, Chengdu University of Traditional Chinese Medicine, Chengdu, China
- 4 School of Economics and Management, Southwest Jiaotong University, Chengdu, China
- 5 School of Railway Section, University of Transport and Communications, Hanoi, Vietnam
Abstract
Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk.
- http://118.70.241.18/english3/news/?21650/dinh-huong-phat-trien-duong-o-to-cao-toc-va-huong-thu-hut-cac-nguon -von-dau-tu-xay-dung-duong-cao-toc.htm
- http://thutuong.chinhphu.vn/Home/Bao-cao-cua-Chinh-phu-do-Thu-tuong-Nguyen-Tan-Dung-trinh-bay-tai-ky-hop -thu-2-Quoc-hoi-Khoa-XII/200710/10828.vgp
- http://www.cengroup.vn/78/tin-tuc-du-an/duong-cao-toc-nao-cua-viet-nam-ngon-phi-khung -nhat-n1830.html
- Zayed, T., Amer, M. and Pan, J. (2008) Assessing Risk and Uncertainty Inherent in Chinese Highway Projects Using AHP. International Journal of Project Management, 26, 408-419. http://dx.doi.org/10.1016/j.ijproman.2007.05.012
- El-Sayegh, S. (2008) Risk Assessment and Allocation in the UAE Construction Industry. International Journal of Project Management, 26, 431-438. http://dx.doi.org/10.1016/j.ijproman.2007.07.004
- El-Sayegh, S.M. and Mansour, M.H. (2015) Risk Assessment and Allocation in Highway Construction Projects in the UAE. Journal of Management in Engineering, 31, 04015004. http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000365
- Zou, P.X.W., Zhang, G. and Wang, J. (2007) Understanding the Key Risks in Construction Projects in China. International Journal of Project Management, 25, 601-614. http://dx.doi.org/10.1016/j.ijproman.2007.03.001
- Olawale, Y.A. and Sun, M. (2010) Cost and Time Control of Construction Projects: Inhibiting Factors and Mitigating Measures in Practice. Construction Management and Economics, 28, 509-526. http://dx.doi.org/10.1080/01446191003674519
- Enshassi, A., Kumaraswamy, M. and Al-Najjar, J. (2010) Significant Factors Causing Time and Cost Overrun in Construction Projects in the Gaza Strip: Contractors’ Perspective. International Journal of Construction Management, 10, 35-60. http://dx.doi.org/10.1080/15623599.2010.10773137
- Rahman, I.A., Memon, A.H. and Karim, A.T.A. (2013) Significant Factors Causing Cost Overrun in Large Construction Projects in Malaysia. Journal of Applied Sciences, 13, 286-293. http://dx.doi.org/10.3923/jas.2013.286.293
- Wijekoon, S.B. and Attanayake, A.M.C.T.K. (2013) Study on the Cost Overrun in Road Construction Projects in Sri Lanka. http://dl.lib.mrt.ac.lk/handle/123/8969
- Alzahrani, J.I. and Emsley, M.W. (2013) The Impact of Contractors’ Attributes on Construction Project Success: A Post Construction Evaluation. International Journal of Project Management, 31, 313-322. http://dx.doi.org/10.1016/j.ijproman.2012.06.006