Analysis of Waste-Rock Transportation Process Performance in an Open-Pit Mine Based on Statistical Analysis of Cycle Times Data — Oak Academic Publishing
Research ArticleOpen AccessGoogle Scholar indexed
Analysis of Waste-Rock Transportation Process Performance in an Open-Pit Mine Based on Statistical Analysis of Cycle Times Data
Department of Chemical and Mining Engineering, College of Engineering and Technology, University of Dar es Salaam, Dar es Salaam, Tanzania
1 Department of Chemical and Mining Engineering, College of Engineering and Technology, University of Dar es Salaam, Dar es Salaam, Tanzania
In this paper, the performance of a waste rock transportation process in an open pit mine was assessed by using cycle time data. A computerized truck- excavator dispatch system was used to record the cycle times. The process was broken into seven steps (or components of the total cycle) , durations of which were recorded for a period of 1 month, leading to N = 60,690 data points or dispatches. The open pit mine studied consisted of 12 waste types loaded by 14 excavators and hauled by 49 trucks (at a trucks-to-excavator ratio of 3.5:1) in 75 changing locations. The string-type data was coded using integers to allow a FORTRAN code to extract process performance parameters using statistical analysis. The study established a wide range of parameters including: the waste material generation rate (about 1.73 million t/month, 81% comprising waste rock), truck fill factor, f , total cycle time ( T ct ), production capacity, theoretical cycle time, non-productive cycle time T np , and cycle time performance ratio (CTPR), denoted as T pr . The factors affecting the process performance include: truck model, excavator model, location (haul distance and road conditions) and material type. For a fixed material type and tonnage, the PDFs of the cycle time components were logarithmic in nature, capable of differentiating performance variations under different factors. It was concluded that the performance of the waste material transportation system in this mine was determined to be acceptable due to mean value of T pr = 2.432 being closer to unity. Reduction measures were suggested to minimize the cycle time for the process bottlenecks determined from Pareto analysis (that is, full haul, empty haul and loading processes).
KeywordsPotentially Acid-Forming (PAF) RockNon-Acid Forming (NAF) RockTruck UtilizationTruck Fill-FactorQueuing TimeLoading Cycle TimeFull and Empty HaulTotal Cycle TimeTheoretical Cycle Time
Alarie, S. and Gamache, M. (2002) Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines. International Journal of Surface Mining, 16, 59-76.
Blouin, S., Guay, M. and Rudie K. (2007) An Application of Discrete-Event Theory to Truck Dispatching. Central European Journal of Operational Research, 15, 369-391. https://doi.org/10.1007/s10100-007-0037-8
Kheiryeh, E. and Osanloo, M. (2012) The Optimal Dispatching Station Site Selection Effective Factor in Open Pit Mines. Proceedings of 21st Int. Symp. on Mine Planning and Equipment Selection (MPES), New Delhi, 28-30 November 2012, 360-372.
Ercelebi, S.G. and Bascetin, A. (2009) Optimization of Shovel Truck System for Surface Mining. Journal of the Southern African Institute of Mining and Metallurgy, 109, 433-439.
Chanda, E.K. and Gardner, S. (2010) A Comparative Study of Truck Cycle Time Prediction Methods in Open-Pit Mining. Engineering, Construction and Architectural Management, 17, 446-460. https://doi.org/10.1108/09699981011074556
Rustan, A. and Nie, S. (1992) New Method to Test Rock Breaking Properties of Explosive in Full Scale. International Journal of Mining and Environment, 6, 191-200.
Kun-Jen, C., Kuo-Lung, H. and Shaw-Ping, L. (2009) The Optimal Production Cycle Time in an Integrated Production-Inventory Model for Decaying Raw Materials. Applied Mathematical Modeling, 33, 1-10. https://doi.org/10.1016/j.apm.2007.10.010
Ta, C.H., Kresta, J.V., Forbes, J.F. and Marquez, H.J. (2005) A Stochastic Optimization Approach to Mine Truck Allocation. International Journal of Mining, Reclamation and Environment, 19, 162-175. https://doi.org/10.1080/13895260500128914
Agrawal, A., Minis, I. and Nagi, R. (2000) Cycle time reduction by improved MRP-Based Production Planning. International Journal of Production Research, 38, 4823-4841. https://doi.org/10.1080/00207540050205659
Tzu-Hsien, L. (2009) Optimal Production Run Length and Maintenance Schedule for a Deteriorating Production System. The International Journal of Advanced Manufacturing Technology, 43, 959-963. https://doi.org/10.1007/s00170-008-1773-1
Giri, B.C. and Yun, W.Y. (2005) Optimal Lot Sizing for an Unreliable Production System under Partial Backlogging and at Most Two Failures in a Production Cycle. International Journal of Production Economics, 65, 229-243. https://doi.org/10.1016/j.ijpe.2004.01.004
Non-Productive Cycle Time
Cycle Time Performance Ratio
Rappold, J. and Yoho, K.D. (2008) A Model for Level-Loading Production in the Process Industries when Demand is Stochastic. Production Planning & Control, 19, 686-701. https://doi.org/10.1080/09537280802573726
Taleizadeh, A.A., Sadjadi, S.J. and Akhavan Niaki, S.T. (2011) Multiproduct EPQ Model with Single Machine, Backordering and Immediate Rework Process. European Journal of Industrial Engineering, 5, 388-411. https://doi.org/10.1504/EJIE.2011.042738
Krzyzanowska, J. (2007) The Impact of Mixed Fleet Hauling on Mining Operations at Venetia Mine. The Journal of the South African Institute of Mining Metallurgy, 107, 215-224.
Erdem, B., and Kormaz, F. (2012) Analysis of Dragline Cycle Time Components. Journal of Mining Science, 48, 545-558. https://doi.org/10.1134/S1062739148030185
Johnson, J.D. (2003) A Framework for Reducing Manufacturing Throughput Time. Journal of Manufacturing Systems, 22, 283-298. https://doi.org/10.1016/S0278-6125(03)80009-2
Li, L., Chang, Q., Ni, J. and Biller, S. (2009) Real Time Production Improvement through Bottleneck Control. International Journal of Production Research, 47, 6145-6158. https://doi.org/10.1080/00207540802244240
Lati, N. and Gilad I. (2010) Minimizing Idle Times in Cluster Tools in the Semiconductor Industry. International Journal of Production Research, 48, 6443-6459. https://doi.org/10.1080/00207540903280556
Patti, A.L. and Watson K.J. (2010) Downtime Variability: the Impact of Duration-Frequency on the Performance of Serial Production Systems. International Journal of Production Research, 48, 5831-5841. https://doi.org/10.1080/00207540903280572
Schultz, C.R. (2004) Spare Parts Inventory and Cycle Time Reduction. International Journal of Production Research, 42, 759-776. https://doi.org/10.1080/00207540310001626210
Kusar, J., Berlec, T., Zefran, F., Starbek, M. (2010) Reduction of Machine Setup Time. Strojniskivestnik - Journal of Mechanical Engineering, 56, 833-845.
Berlec, T., Govekar, E., Grum, J., Potocnik, P. and Starbek, M. (2008) Predicting Order Lead Times. Strojniskivestnik - Journal of Mechanical Engineering, 54, 308-321.
Jeong, K.Y. and Phillips, D.T. (2001) Operational Efficiency and Effectiveness Measurement. International Journal of Operations and Production Management, 21, 1404-1416. https://doi.org/10.1108/EUM0000000006223
Rai, P. (2004) Performance Assessment of Draglines in Open Cast Mines. Indian Journal of Engineering & Material Science, 11, 493-498.
Rai, P., Yadav, U. and Kumar, A. (2011) Productivity Analysis of Draglines Operating in Horizontal Tandem Mode of Operation in Coal Mine: A Case Study. Geotechnical and Geological Engineering, 29, 493-504. https://doi.org/10.1007/s10706-011-9398-9
Mohammadi, M., Rai, P., Oraee, K. and Kumar, M. (2013) Analysis of Availability and Utilization of Dragline for Enhancement of Productivity in Surface Mines—A case study. Proceeding of 23rd World Mining Congress, Montreal, Paper No. 598.
Ko, S.S., Serfozo, R. and Sivakumar, A.I. (2004) Reducing Cycle Times in Manufacturing and Supply Chains by Input and Service Rate Smoothing. IIE Transactions, 36, 145-153. https://doi.org/10.1080/07408170490245441
Sanders, R. (1987) The Pareto Principle: Its Use and Abuse. Journal of Services Marketing, 1, 37-40. https://doi.org/10.1108/eb024706
Elbeltagi, I., Kempen, T. and Garcia, E. (2014) Pareto-Principle Application in non-IT Supported CRM Processes: A Case Study of a Dutch Manufacturing SME. Business Process Management Journal, 20, 129-150. https://doi.org/10.1108/BPMJ-05-2012-0043
Kangonji, I.S. and Manyele, S.V. (2016) Analysis of Health Workers’ Perceptions on Medical Waste Management in Tanzanian Hospitals. Engineering Journal, 8, 445-459.
Osanloo, M. and Hekmat, A. (2005) Prediction of Shovel Productivity in the Gole-Gohar Iron Mine. Journal of Mining Science, 41, 177-184. https://doi.org/10.1007/s10913-005-0081-5
Barbaro, R. and Rosenshine, M. (1987) Evaluating the Productivity of a Shovel-Truck Materials Haulage System Using a Cyclic Queuing Model. AIME Transactions, 282, 1824-1827.