Research ArticleOpen AccessGoogle Scholar indexed
Long Term Load Forecasting and Recommendations for China Based on Support Vector Regression
School of Economics and Business Administration, Chongqing City Management College, Chongqing, China
School of Economics and Business Administration, Chongqing City Management College, Chongqing, China
School of Economics and Business Administration, Chongqing City Management College, Chongqing, China
- 1 School of Economics and Business Administration, Chongqing City Management College, Chongqing, China
- 2 School of Economics and Business Administration, Chongqing City Management College, Chongqing, China
- 3 School of Economics and Business Administration, Chongqing City Management College, Chongqing, China
Energy and Power Engineering·Volume 04 (2012)·Pages 380–385·Published 26 September 2012·DOI10.4236/epe.2012.45050
Copy link · social · email
Abstract
Long-term load forecasting (LTLF) is a challenging task because of the complex relationships between load and factors affecting load. However, it is crucial for the economic growth of fast developing countries like China as the growth rate of gross domestic product (GDP) is expected to be 7.5%, according to China’s 11th Five-Year Plan (2006-2010). In this paper, LTLF with an economic factor, GDP, is implemented. A support vector regression (SVR) is applied as the training algorithm to obtain the nonlinear relationship between load and the economic factor GDP to improve the accuracy of forecasting.
KeywordsLong Term Load ForecastingSupport Vector RegressionChina
- L. Ghods, M. Kalantar and Ieee, “Methods for Long- Term Electric Load Demand Forecasting; A Comprehensive Investigation,” IEEE International Conference on Industrial Technology, Chengdu, 2008, pp. 855-858.
- H. M. Al-Hamadi and S. A. Soliman, “One Year Long- Term Electric Load Forecasting Based on Multiple Regression Models and Kalman Filtering Algorithm,” Engineering Intelligent Systems for Electrical Engineering and Communications, Vol. 14, 2006, pp. 79-88.
- H. M. Al-Hamadi and S. A. Soliman, “Long-Term/Mid- Term Electric Load Forecasting Based on Short-Term Correlation and Annual Growth,” Electric Power Systems Research, Vol. 74, No. 3, 2005, pp. 353-361. doi:10.1016/j.epsr.2004.10.015
- L. D. Duan, D. X. Niu and Z. H. Gu, “Long and Medium Term Power Load Forecasting with Multi-Level Recursive Regression Analysis,” 2nd International Symposium on Intelligent Information Technology Application, Shanghai, 20-22 December 2008, pp. 514-518. doi:10.1109/IITA.2008.397
- O. Carpinteiro, I. Lima, R. C. Leme, A. de Souza, E. M. Moreira and C. Pinheiro, “A Hierarchical Neural Model with Time Windows in Long-Term Electrical Load Forecasting,” Neural Computing & Applications, Vol. 16, No. 4-5, 2007, pp. 465-470. doi:10.1007/s00521-006-0072-8
- O. Carpinteiro, R. C. Leme, A. de Souza, C. Pinheiro and E. M. Moreira, “Long-Term Load Forecasting via a Hierarchical Neural Model with Time Integrators,” Electric Power Systems Research, Vol. 77, No. 3-4, 2007, pp. 371-378. doi:10.1016/j.epsr.2006.03.014
- O. Carpinteiro, I. Lima, R. C. Leme, A. de Souza, E. M. Moreira and C. Pinheiro, “A Hybrid Neural Model in Long-Term Electrical Load Forecasting,” Artificial Neural Networks—ICANN 2006, Vol. 4132, 2006, pp. 717- 725.
- A. A. Abou El-Ela, A. A. El-Zeftawy, S. M. Allam and G. Atta, “Long-Term Load Forecasting and Economical Operation of Wind Farms for Egyptian Electrical Network,” Electric Power Systems Research, Vol. 79, No. 7, 2009, pp. 1032-1037. doi:10.1016/j.epsr.2009.01.003
- O. A. S. Carpinteiro, I. Lima, R. C. Leme, A. C. Z. de Souza, E. M. Moreira and C. A. M. Pinheiro, “A Hybrid Neural Model in Long-Term Electrical Load Forecasting,” 16th International Conference on Artificial Neural Networks (ICANN 2006), Athens, 2006, pp. 717-725.
- N. X. Jia, R. Yokoyama, Y. C. Zhou and Z. Y. Gao, “A Flexible Long-Term Load Forecasting Approach Based on New Dynamic Simulation Theory—GSIM,” International Journal of Electrical Power & Energy Systems, Vol. 23, No. 7, 2001, pp. 549-556. doi:10.1016/S0142-0615(00)00078-8