Research ArticleOpen AccessGoogle Scholar indexed
Discuss of Key Issue for Automatic BATS Control in Regional Power Grid
Dongfang Electronics Corporation, Yantai, China
Dongfang Electronics Corporation, Yantai, China
Dongfang Electronics Corporation, Yantai, China
- 1 Dongfang Electronics Corporation, Yantai, China
- 2 Dongfang Electronics Corporation, Yantai, China
- 3 Dongfang Electronics Corporation, Yantai, China
Energy and Power Engineering·Volume 09 (2017)·Pages 189–197·Published 6 April 2017·DOI10.4236/epe.2017.94B023
Copy link · social · email
Abstract
Busbar Automatic Transfer Switch (BATS) is very important for power distribution reliability. However, BATS can’t consider whether it cause overloading of devices after it acts. In this paper, we introduce the design principle of Automatic BATS control from whole architecture including its function, strategy and a rule of on-off. On the other hand, the running experience and effect is also introduced. Site operation shows that the proposed method is feasible and it can ensure power grid reliability.
KeywordsBusbar Automatic Transfer Switch (BATS)N Minus OneOn-Line ControllingAutomaitc BATS Control
- Ding, S.W. (2007) Electric Power Systems Automechanism Theory. China Electric Power Press, Beijing.
- Li, X.Y., Wei, W., Wang, Y.H., et al.(2009) Study on the Development and Technology of Strong Smart Grid. Power System Protection and Control, 37, 1-6.
- Pan, K.Y., Liu, Z.Y., Song, X.Q., et al.(2009)Application of Automatic Load Controlling System in Foshan Power Grid. Automation of Electric Power Systems, 33, 94- 97.
- Li, S.Q., Zhang, M.J., Nin, X.H., et al.(2009) Automatic Loading Transfer Control Technology to Eliminate 330kV Transformer Overload. Power System Protection and Control), 37, 106-108.
- Pan, Q., Shi, B.N., Tang, J., et al.(2012) Study on Optimal Load Shedding Control to Eliminate Transformer Overload Based on Automatic Operation Mode Identification. Power System Protection and Control, 40, 125-128.
- Pan, K.Y. and Liu, Z.Y. (2013) Application of On_Lined Load-transfer Aided Decision System in Large Power Grid. Electrical Engineering, 5, 54-57.
- Wu, W.C., Sun, H.B., Zhang, B.M., et al. (2000) Simulation of Automatic Device Based on User-defined Model in Integrated EMS/DTS. Automation of Electric Power Systems, 24, 57-60.
- Pan, K.Y. and Tan, D.S. (2015) Optimal Strategy of on-line Strap Controlling of BATS Based on EMS. Electrical Engineering, 7, 104-107.
- Pan, K.Y., Tan, D.S., Zhao, Y., et al. (2015) A Fast Comutping Method of N-1 in Static Safety Analysis Considering BATS in Regional Power Grid, Automation of Electric Power Systems, 39, 122-126.
- Pan, K.Y., Tan, D.S., Li, J.G., et al. (2015) Optimal Strategy of Strap Controlling of BATS Considering Time-characteristics and Split-Characteristics. Electrical Engineering, 12, 102-105.