Analysis of Nigerian Electricity Generation Multi Year Tariff Order Pricing Model
- 1 Mechanical Engineering Department, Nnamdi Azikiwe University, Awka, Nigeria
- 2 Mechanical Engineering Department, Nnamdi Azikiwe University, Awka, Nigeria
- 3 Mechanical Engineering Department, Enugu State University of Science and Technology, Enugu, Nigeria
- 4 Electrical Engineering Department, Nnamdi Azikiwe University, Awka, Nigeria
Abstract
The Multi Year Tariff Order (MYTO) is the Nigerian Electricity Regulatory Commission (NERC) pricing framework for determining the Nigerian Electricity Supply Industry (NESI) pricing model. One of the objectives of the NERC’s MYTO pricing model is to ensure regulated electricity end user tariff without compromising return on investment. Achieving this objective is imperative to attract investors in the growing Nigerian electricity market. However, NESI has hitherto been faced with challenges ranging from its inability to provide sufficient power to its customers to not being viable enough to provide return on capital invested. In this paper , sensitivity analysis of power plant operation and performance parameters on the cost of electricity (CoE) generation using MYTO (power generation) pricing model were evaluated. Thermodynamic modeling and simulation of an open cycle gas turbine (OCGT) was carried out to augment scarce data on power plant performance and operation in Nigeria. Sensitivity analysis was carried out using probabilistic method based on Monte Carlo simulation (MCS) implemented in commercial software (@ Risk ® ). The result highlighted sensitivity of the model input parameters to cost of electricity generation based on technical and financial assumptions of MYTO model. Seven most influential parameters affecting generation cost were identified. These parameters and their correlation coefficients are given as: 1) foreign exchange rate, 0.76; 2) cost of fuel, 0.51; 3) thermal efficiency, -0.23; 4) variable operation and maintenance cost, 0.22; 5) fixed operating and maintenance cost, -0.03; 6) capacity factor, -0.02; and 7) average capacity degradation, 0.01. Based on the gas turbine engine and input parameter distributions statistics for this study, the generation cost lies between 9.84 to 15.45 N /kWh and the probabilities of CoE within these values were established.
- Consultation Paper for the Review of the Transmission Company of Nigeria (TCN) Tariff under the Multi-Year Tariff Order Methodology; February 2015.
- Oyedepo, S.O., Fagbenle, R.O., Adefila, S.S. and Adavbiele, S.A. (2014) Performance Evaluation and Economic Analysis of a Gas Turbine Power Plant in Nigeria. Energy Conversion and Management, 79, 431-440. https://doi.org/10.1016/j.enconman.2013.12.034
- Sule, B.F., Ajao, K.R., Ajimotokan, H.A. and Garba, M.K. (2011) Compact Fluorescent Lamps and Electricity Consumption Trends in Residential Buildings in Ilorin, Nigeria. International Journal of Energy Sector Manage, 5, 162-168. https://doi.org/10.1108/17506221111145968
- Imperatives, Strategic. (2016) Report of the World Commission on Environment and Development: Our Common Future. http://www.un-documents.net/our-common-future.pdf
- Amadi, S. (2014) NERC’s Strategic Sectorial Prioritization Action Plan for Post Privation Overall Development 2014. Nigerian Electricity Regulatory Commission. http://www.nercng.org/index.php/component/remository/NERC-Letters-Presentations-Reports-and-Papers/orderby,1/page,2/?Itemid=0
- Iwayemi, A. (2008) Investment in Electricity Generation and Transmission in Nigeria: Issues and Options. International Association for Energy Economics, First Quarters, 37-42.
- Ekpo, E.O. (2012) MYTO 2 and Embedded Generation; GE Nigeria Power Development Summit 4/2012.
- Ransome, O. (2007) Nigerian Electricity Regulatory Commission’s-Notice of Proposed Establishment of a Methodology for a Multi-Year Tariff Order; Federal Republic of Nigeria Official Gazette. The Federal Government Printer, Lagos, 18, 124-133
- Walter S., Danie, J.P. and Thomas, H. (1995) A Manual for the Economic Evaluation of Energy Efficiency and Renewable Energy Technologies (NREL) Report No. NREL/TP-462-5173.
- The Economic Appraisal of Investment Projects at the European Investment Bank (EIB), 2013. http://www.eib.org/attachments/thematic/economic_appraisal_of_investment_projects_en.pdf
- Anosike, N.B. (2013) Technoeconomic Evaluation of Flared Natural Gas Reduction and Energy Recovery Using Gas-to-Wire Scheme. Ph.D. Thesis, Cranfield University, United Kingdom.
- Swan, L.G. and Ugursal, V.I. (2009) Modeling of End-Use Energy Consumption in the Residential Sector: A Review of Modeling Techniques. Renewable and Sustainable Energy Reviews, 13, 1819-1835. https://doi.org/10.1016/j.rser.2008.09.033