Comparing the Efficiency of Manual and Electronic Tender Document Preparation: Cost and Time Context
- 1 Bangladesh University of Professionals, Dhaka, Bangladesh
- 2 Department of Computer Science and Engineering, Jahangirnagar University, Savar, Bangladesh
Abstract
In Bangladesh, both manual and e-GP system is used to perform public procurement. Before tender publication, tender documents have to be prepared by the Procurement Entities (PEs). The problem is that the manual tendering system involves more cost and time in preparing tender documents. The study’s purpose is to compare now the efficiency of tender document preparation in the manual system with the e-GP system. This study tests the cost and time involved in tender document preparation, both manual and e-procurement tenders. Sample data was collected from the 11 RHD zones. Structured survey questionnaires were used to collect primary data from the PE officers of RHD. A hypothesis test was performed using the model of independent samples t-test. The test results indicated that e-Procurement tender document preparation costs and time were less than manual tendering. Academicians, researchers, PE officers, and policymakers will benefit from the study’s conclusions.
- World Bank (2002) Bangladesh Country Procurement Assessment Report. Report No. 24144-BD, World Bank, Washington DC.
- Akando, Md.Z.I. (2016) Challenges and Prospects of E-Procurement in Bangladesh: A Study on Roads and Highways Department. Master’s Thesis, BRAC University, Dhaka. http://dspace.bracu.ac.bd/xmlui/bitstream/handle/10361/6516/14272015_MAGD.pdf?sequence%20=%201&isAllowed%20=%20y
- IMED Proggapon (2011) Bangladesh E-Gp Guideline. https://www.eprocure.gov.bd/help/guidelines/eGP_Guidelines.pdf
- Dream Civil (2022) What Is Tender?: 5 Steps in Tender Preparation|Tender Notice. https://dreamcivil.com/tender-preparation/
- CPTU (2022) Standard Tender Documents (STD). https://cptu.gov.bd/standard-documents/standard-tender-document.html