Research ArticleOpen AccessGoogle Scholar indexed
Classification of ITU Recommendations and Reports Base on IMT-2020 High Frequency Candidate Band EMC Analysis
The State Radio Monitoring Center, Beijing, China
Beijing University of Posts and Telecommunications, Beijing, China
North China Electric Power University, Beijing, China
The State Radio Monitoring Center, Beijing, China
Beijing University of Posts and Telecommunications, Beijing, China
- 1 The State Radio Monitoring Center, Beijing, China
- 2 Beijing University of Posts and Telecommunications, Beijing, China
- 3 North China Electric Power University, Beijing, China
- 4 The State Radio Monitoring Center, Beijing, China
- 5 Beijing University of Posts and Telecommunications, Beijing, China
International Journal of Communications, Network and System Sciences·Volume 10 (2017)·Pages 163–169·Published 26 May 2017·DOI10.4236/ijcns.2017.105B016
Copy link · social · email
Abstract
This paper introduced ITU-R TG 5/1 task group, as well as the current research situation, especially illustrated some interference scenario. Based on 5G high frequency candidate band, radio communication services and the electromagnetic compatibility analysis work, we studied all recommendations and reports related to candidate sub bands, and then classified three very important sub-bands’ recommendations and reports, which had played a positive role in promoting 5G high-frequency candidate band radio interference coexistence analysis research.
KeywordsIMT-2020Candidate BandRecommendationsReportsClassification
- http://www.itu.int/pub/R-REC
- ITU-R Study Groups (2013) ITU-R Handbook.
- CPM19-1 Decision on the Establishment and Terms of Reference of Study Group 5 Task Group 5/1 (TG 5/1) on WRC-19 Agenda Item 1.13, 2015.
- Results of the First Session of the Conference Preparatory Meeting for WRC-19 (CPM19 1) (CPM19-1), ITU-R 2015.
- Japan. Considerations on Working Method of Task Group 5/1. ITU-R Document 5-1/1-E, May 2016.
- U.K. Organization of Itu-R Tg5/1 for the Preparation of the Studies Relevant to AI 1.13 of WRC-19. ITU-R Document 5-1/2-E, May 2016.
- China. Proposed Work Method and Work Plan for Task Group 5/1 on Agenda Item 1.13. ITU-R Document 5-1/6-E, May 2016.
- China. Down Selection the Sharing and Compatibility Study Scenarios on WRC-19 Agenda Item 1.13. ITU-R Document 5-1/7-E, May 2016.
- Brazil. Proposal for Organisation of the Work within Itu-R Tg5/1 for the Preparation of the Studies Relevant to WRC-19 AI 1.13. ITU-R Document 5-1/9-E, May 2016.
- Canada. Considerations on the Working Methods within Task Group 5/1. ITU-R Document 5-1/10-E, May 2016.