Assessment of Relationship of Some Causal Factors Associated with Productivity of Longwall Mining Using Structured Equation Modeling
- 1 Trafigura, Mumbai, India
- 2 Mining Engineering Department, Indian Institute of Technology, Kharagpur, India
Abstract
Enhancement of productivity optimization is steadily gaining the priority in mining companies especially in the underground coal mining industry which faces a daunting task to balance marginal profit generation with a comparatively high cost of production, volatile market price and rapid grade variation. This paper is aimed to analyze some of the causal factors both technical and site specific which are directly or indirectly impacting the productivity of the longwall coal mining system such as downtime of equipment system in longwall panel, overloading of conveyors and bin, preventive maintenance, gas management practices and injury severity rate. Structured Equation Modelling (SEM) was used to study the causal relationships between the above-mentioned factors and mine productivity. The equipment considered for analysis included shearer, armored face conveyor, crusher, bridge stage loader, chock supports, main gate drive, gate conveyor, hydraulic pumps and crusher. SEM was applied to relate the correlations existing among these causal variables in order to assess their direct or indirect impact on mining productivity. Based on the data extracted over a period of 10 months which included the extraction of 2 longwall panels, the study revealed a significant negative causal relationship between injury severity rate (p < 0.01) and equipment downtime (p = 0.001), with mine productivity. However, preventive maintenance delay time, gas management delay time and conveyor overloading delay time were found to have an insignificant direct influence on mine productivity but indirectly modify it through a significant mediator relationship with equipment downtime. This information would assist mine management to take proper preventive measures.
- Bessinger, S.L. (2011) Longwall Mining. In: Peter, D., Ed., SME Mining Engineering Handbook, 3rd Edition, Chapter 13.8, Society for Mining, Metallurgy, and Exploration, Englewood, 1399.
- Mishra, D.P., Sugla, M. and Singha, P. (2013) Productivity Improvement in Underground Coal Mines—A Case Study. Journal of Sustainable Mining, 12, 48-53. https://doi.org/10.7424/jsm130306
- University of Wollongong Longwall Website. http://eis.uow.edu.au/longwall/html/history.html
- CIL Technology Development & Mechanization_CIL_19.1.2015.
- Tan, C.S., Usubamatov, R., Mohd, F.B. Hamzas, Md.A., Low, K.W., Yao, T.K. and Bahari, M.S. (2014) Parameters Investigation of Mathematical Model of Productivity for Automated Line with Availability by DMAIC Methodology. Journal of Applied Mathematics, 2014, Article ID: 206717. https://doi.org/10.1155/2014/206717
- Giovannini, E. and Nezu, R., Ed. (2001) Measurement of Aggregate and Industrial Level Productive Growth. Measuring Productivity, OECD Manual, Measurer La Productivite, OECD 2001, Paris.
- Ralston, J.C., Hargrave, C.O. and Dunn, M.T. (2017) Longwall Automation: Treands, Challenges and Opportunities. International Journal of Mining Science and Technology, 27, 733-739. https://doi.org/10.1016/j.ijmst.2017.07.027
- Wadwani, H., Lokhande, R. and Satyabdi, J. (2017) Productivity Improvement in Underground Coal Mines. https://www.researchgate.net/publication/320058621
- Cai, D., Baafi, E. and Porter, I. (2012) Modelling a Longwall Production System Using Flexsim 3D Simulation Software. In: Singhal, R., Topal, E., Fytas, K., Yellishetty, M. and Mehrotra, A., Eds., Mine Planning and Equipment Selection, The Reading Matrix Inc., Irvine, 107-114.
- Woodhouse, J. (2011) Physical Asset Management. In: Society for Mining, Metallurgy, and Exploration, Mining Engineering Handbook, 3rd Edition, Chapter 9.7, 781.
- Grayson, R.L. (2001) Safety vs. Productivity and Other Factors in US Underground Coal Mines. Mining Engineering, 53, 41-44.
- Hermanus, M.A. (2007) Occupational Health and Safety in Mining—Status, New Developments, and Concerns. The Journal of the South African Institute of Mining and Metallurgy, 107, 531-538.
- Samanta, B.B. and Sarkar, S.K.M. (2004) Reliability Modelling and Performance Analyses of an LHD System in Mining. The Journal of South African Institute of Mining and Metallurgy, 1-8.