BIM as a Computer-Aided Design Methodology in Civil Engineering
- 1 Department of Civil Engineering, University of Lisbon, Lisbon, Portugal
Abstract
Building Information Models (BIM) have revealed themselves as a good tool to support construction actions, due to their ability to store all the information in one digital model and to promote collaboration between all participants in a project. Teaching Civil Engineering requires a permanent updating of knowledge concerning procedures and technologies used in the construction industry. In this sense, the school should seek to adapt its curriculum to include innovative issues to support new technologies. So, in an educational context, the aim of the present work is to disseminate knowledge concerning the benefits provided when implementing BIM in several aspects within the construction activity. In a Civil Engineering school some topics of BIM application were developed by students within MSc researches. The text describes in detail some of the main topics, showing distinct use of BIM: Generation and use of a 4D/BIM model to support construction planning; coordination of construction project based on BIM methodology; conflict analysis based in an architectural 3D/BIM model. Several study cases were modelled and analyzed, confronting the BIM use with the traditional way when performing the same tasks, and consequently recommendations were carried out. This work contributed to demonstrate the advantages of employing BIM for building tasks purposes when compared with the traditional process, and in a didactic context the main objective is to add competitive skills in the training of future civil engineers.
- Azhar, S., Hein, M. and Sketo, B. (2008) Building Information Modeling (BIM): Benefits, Risks and Challenges. http://ascpro.ascweb.org/chair/paper/CPGT182002008.pdf
- Eadie, R., Browne, M., Odeyinka, H., McKeown, C. and McNiff, S. (2013) BIM Implementation throughout the UK Construction Project Lifecycle: An Analysis. Automation in Construction, 36, 145-151. https://doi.org/10.1016/j.autcon.2013.09.001
- Tardif, M. and Smith K.D. (2009) Building Information Modeling: A Strategic Implementation Guide. John Wiley & Sons, Hoboken.
- Singh, V., Gu, N. and Wang, X. (2011) A Theoretical Framework of a BIM-Based Multi-Disciplinary Collaboration Platform. Automation in Construction, 20, 134-144. https://doi.org/10.1016/j.autcon.2010.09.011
- Chen, L.J. and Luo, H. (2014) A BIM-Based Construction Quality Management Model and Its Applications. Automation in Construction, 46, 64-73. https://doi.org/10.1016/j.autcon.2014.05.009
- Du, J., Shi, Y., Mei, C., Quarles, J. and Yan, W. (2016) Communication by Interaction: A Multiplayer VR Environment for Building Walkthroughs. 2016 Construction Research Congress, San Juan, 31 May-2 June 2016, 2281-2290.
- Wang, X. (2012) Extending Building Information Modelling (BIM): A Review of the BIM Handbook. Australasian Journal of Construction Economics and Building, 12, 101-102. https://doi.org/10.5130/ajceb.v12i3.2749
- Eastman, C., Teicholz, P., Sacks, R. and Liston, K. (2011) BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors. John Wiley & Sons, Hoboken.
- Mota, C.S. (2015) 4D Works Planning Based on BIM Technology. MSc Thesis in Civil Engineering, University of Lisbon, Lisbon.
- Santos, J.P. (2010) Construction Planning Using 4D Virtual Models. MSc Thesis in Civil Engineering, University of Lisbon, Lisbon.
- Berdeja, E.P. (2014) Conflict Analyses in a BIM Based Design. MSc Thesis in Civil Engineering, University of Lisbon, Lisbon.
- Khanzode, A., Fischer, M. and Reed, D. (2008) Benefits and Lessons Learned of Implementing Building Virtual Design and Construction (VDC) Technologies for Coordination of Mechanical, Electrical, and Plumbing (MEP) Systems on a Large Healthcare Project. ITcon, 13, 324-342. http://www.itcon.org/2008/22
- Pitake, S. and Patil, D. (2013) Visualization of Construction Progress by 4D Modeling Application. International Journal of Engineering Trends and Technology, 4, 3000-3005.