There are various risk factors in the application of BIM. The reasonable management of risk factors can avoid unnecessary cost losses. Based on a large amount of literature, the article combed out the 17 risk factors that existed in the operation and maintenance phase, and revised it through expert interview method, and then obtained 11 risk factors. Semi-structured interviews were used to investigate the relationship between risk factors, and established Interpretative Structural Modeling (ISM) to analyze the hierarchical relationship of risk factors, and got two surface risk factors, five middle risk factors, and four deep risk factors. Finally, relevant improvement suggestions are put forward to eliminate or reduce the risk of using BIM in the operation and maintenance phase.
KeywordsOperation and Maintenance PhaseISMBIMRisk Factor
Azhar, S. (2011). Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry. Leadership & Management in Engineering, 11, 241-252. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127
Bernstein, P. G., & Pitman, J. H. (2005). Barriers to the Adoption of Building in formation Modeling in the Building Industry. Autodesk Building Solutions Whitepaper, 10, 231-241.
Chen, J. Y., Ding, J., Zheng, W., & Chen, F. (2017). Study on the Risk of BIM Technology Application in Shanghai Planetarium Project. Project Management, No. 10, 61-64.
Chen, Q. (2012). BIM Adoption Risk Study in Building Design Project. Civil Engineering Information Technology, 4, 22-31.
Chien, K. F., Wu, Z. H., & Huang, S. C. (2014). Identifying and Assessing Critical Risk Factors for BIM Projects: Empirical Study. Automation in Construction, 45, 1-15. https://doi.org/10.1016/j.autcon.2014.04.012
Ding, X. X., & Wang, J. J. (2016). Risk of Proprietor in Construction Projects Based on BIM. Journal of Jilin Jianzhu University, 33, 97-100.
Eadie, R., Odeyinka, H., Browne, M., McKeown, C., & Yohanis, M. (2014). Building Information Modelling Adoption: An Analysis of the Barriers to Implementation. Journal of Engineering and Architecture, 2, 77-101.
Eastman, C., Eastman, C. M., Teicholz, P. et al. (2011). BIM Handbook: A Guide to Building Information Modeling for Owner, Manager, Designer, Engineers and Contractors (p. 243). Hoboken, NJ: John Wiley & Sons.
Feng, S. G., Chen, G. C., & Li, Q. M. (2019). BIM Application Risks and Contract Countermeasures in Engineering Projects: A Study from the Perspective of Owners. Journal of Engineering Management, 33, 116-120.
Guo, L. (2015). Risk Identification and Responses of BIM-Application in Construction Projects. Construction Economy, 36, 30-34.
Hu, S. J., Xu, B., & Wang, J. P. (2018). Research on Risk Factors Affecting the Application of BIM Technology in Construction Enterprises. China Real Estate, No. 15, 65-73.
Hu, Z. Z., Peng, Y., & Tian, P. L. (2015). A Review for Researches and Applications of BIM-Based Operation and Maintenance Management. Journal of Graphics, 36, 802-809.
Li, M. M., Lai, J. Y., Chen, Q. L., Yi, Z. N., & Sun, X. D. (2018). Application Risk Evaluation of BIM Technology Based on SEM. Journal of Chongqing University of Technology (Natural Science), 32, 206-212.
Li, Y. W. (2016). Research on Risk Assessment of BIM Application in Construction Project. Chongqing: Chongqing University.
Liang, Z. F. (2020). Tianjian Tianjiao Project BIM Technology + Management Application Practice. Information of China Construction, No. 24, 42-47.
Liu, J. K., Liu, J. C., Wang, D., & Zhu, J. (2018). An Analysis of BIM Construction Project Risks Using the DEMATEL Model. Journal of Guangdong University of Technology, 35, 72-78.
Meng, N. (2017). Four Key Words to Interpret the Digital Transformation of the Construction Industry. Architecture, No. 14, 18-21.
Qin, X., Mancini, M., Travaglini, A., Lv, K. C., & Wang, M. (2016). A Comparative Study on Barriers between China and Italy in BIM Adoption from the Construction Market Perspective. Journal of Management, 13, 1718-1727.
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014). Construction Projects Selection and Risk Assessment by Fuzzy AHP and Fuzzy TOPSIS Methodologies. Applied Soft Computing, 17, 105-116. https://doi.org/10.1016/j.asoc.2014.01.003
Tian, J. C. (2018). Research on Risk Assessment of BIM Application in Construction Projects. Jinan: Shandong Jianzhu University.
Tong, Z., & Wang, D. B. (2014). Research on the Application of BIM in the Operation and Maintenance Management of Commercial Real Estate Projects. China Housing Facilities, No. 7, 98-98.
Wang, D. (2015). Research on the Risk Management of BIM Application Projects. Xi’an: Xi’an University of Architecture and Technology.
Wang, J., Zhang, Y. Y., Wang, X. C., Yu Bo, Zhou, F. P., & Wang, J. Y. (2019). Research on Barriers to BIM Data Sharing under the Owner-Driven Mode. Journal of Engineering Management, 33, 36-41.
Xie, X., Qin, X., & Wang, F. H. (2018). Study on Establishment and Evaluation of Risk Network in BIM Technology Based on Owners’ Side. Journal of Huaqiao University (Natural Science Edition), 39, 37-42.
Xu, H. Y. (2020). Application of BIM Technology in the Subway Construction Schedule Risk Management. Value Engineering, 39, 224-226.
Xu, J., Li, A. H., Liu, H. Q., Ye, M. Z., & Zhang, J. R. (2014). Application and Risk Analysis of BIM in Railway Systems. Journal of Railway Engineering Society, No. 3, 129-133.
Xu, M. L., & Xiong, F. (2014). The Study of BIM Risk in Application Phrase. Construction Technology, 43, 526-531.
Yang, J. G. (2017). Research on the Application of BIM Technology in Project Cost Risk Management. China High-Tech Enterprises, No. 9, 54-55.
Yu, Y., Wang, W., Shi, L. Y., & Wang, Y. H. (2018). Application of BIM Technology in Longhu Financial Center Project. Construction Safety, 33, 55-57.
Zhang, H., Zu, P. X., Li, Y. F., & He, Q. (2016). Research on the Application of BIM Technology Based on Structural Equation. Journal of Engineering Management, 30, 40-44.
Zhang, J., Zhang, Y. B., & Shen, W. (2017). Analysis of BIM Risk Factors for Construction Enterprises Based on AHP—A Case Study of Tianjin Goldin Finance 117 Building Project. Journal of Beijing University of Civil Engineering and Architecture, 33, 69-75.
Zhu, P. H., & Fu, R. (2020). Application of BIM Technology in Water Supply and Drainage Engineering Design—A Case Study of Baishishan Geological Museum in Baoding, Hebei Province. Jiangxi Building Materials, No. 4, 75-76.