Going beyond Triviality: The Toyota Production System—Lean Manufacturing beyond Muda and Kaizen
- 1 ETH Zürich IWF, Zurich, Switzerland
- 2 Inspire AG, Zurich, Switzerland
Abstract
Personal consulting experience has been showing that even many proven managers responsible for Lean Six Sigma Operational Excellence (OPEX) techniques have not fully understood the profound and comprehensive significance of Lean. Apart from the idealized interpretation of Lean boiled down to the limited concepts of Muda and Kaizen, the classical “temple” representation of the Toyota Production System (TPS) often leads to the interpretation that Lean is a toolbox from which one can select supposedly independent tools. By picking just some tools, however, the full potential of the TPS certainly cannot be exploited and—in the worst case—it may even cause production disruption. This essay criticizes the wide-spread ultra-simplification of concepts and, as a consequence, the distorted interpretation leads to an inappropriate use of the Lean tools. It presents two additional representations of the classical TPS temple model stressing the intrinsic systemic effects as well as the underlying theory concepts of the TPS to allow a flawless Just-in-Time (JIT) production. In fact, the original TPS is not a toolbox, but a comprehensive synergic tool system.
- Ohno, T. (1988) Toyota Production System: Beyond Large Scale Production. Productivity Press, New York.
- Liker, J.K. (2004) The Toyota Way, 14 Management Principles from the World’s Greatest Manufacturer. McGraw-Hill, New York.
- Womack, J.P., Jones, D.T. and Roos, D. (1990) The Machine that Changed the World. Free Press, New York.
- Womack, J.P. and Jones, D.T. (2003) Lean Thinking. Free Press, New York.
- Rüttimann, B.G., Fischer, U.P. and Stöckli, M.T. (2014) Leveraging Lean in the Office: Lean Office Needs a Novel and Differentiated Approach. Journal of Service Science and Management, 7, 352-360.
- Rüttimann B.G. and Stöckli M.T. (2015) Reasons for Operational Excellence Deployment Failures and How to Avoid Them. Journal of Service Science and Management, 8, 612-618. http://dx.doi.org/10.4236/jssm.2015.84061
- Rüttimann, B. and Wegener, K. (2014) Einführung in die Methoden von Lean Manufacturing und Six Sigma Quality Management. ETH Tools-IV Kurs, Lecturing Notes HS2014, D-MAVT.
- Goldratt, E. and Cox, J. (1984) The Goal: Excellence in Manufacturing. North River Press, Great Barrington.
- Rüttimann, B.G. (2015) Discourse about Linear Programming and Lean Manufacturing: Two Different Approaches with a Similar, Converging Rational. Journal of Service Science and Management, 8, 85-91.
- Rüttimann, B. (2015) Von Lean zu Industrie 4.0—eine Evolution? Von einer visionären Idee zum realen Verständnis. Presentation Held at Fertigungstechnisches Kolloquium, 26 November 2015, ETH Zurich/IWF, Switzerland.
- Rother, M. and Shook, J. (2003) Learning to See. Lean Enterprise Institute (LEI), Cambridge Center, Cambridge.