A Comparative Study of Managing a Project Using Traditional Management Techniques and a Critical Chain Project Management Methodology in Aircraft Maintenance Field
- 1 University of Nottingham Ningbo China, Ningbo, China
- 2 Department of Management, National University of Singapore, Queenstown, Singapore
- 3 Ningbo DEKO Information Technology Company Limited, Ningbo, China
Abstract
Aircraft on ground or down-time for its maintenance is a clear loss in revenue for an airline operation. With never ending competition and growing operat ing costs of aircraft, airlines continuously need to explore opportunities to reduce the aircraft down-time in order to remain sustainable. Due to round the clock operation feature of scheduled airlines, aircraft maintenance operations are generally carried out using traditional management methodologies in stead of considering it as a project. Though aircraft heavy maintenance checks consist of several major tasks that can last from few weeks to a year, the maintenance organisations do not adopt modern project management methodologies. Therefore, this paper models a heavy maintenance check of an Airbus aircraft as a typical project and adopt s contemporary project management methodology to explore the possibility of reducing the downtime. To thi s end, a case study has been done at an aircraft maintenance company to analyse the potential of this project management method in aircraft maintenance industry.
- Critical Chain (n.d) Manage Projects with the Critical Chain: The Critical Chain Project Management, an Alternative to Classic Project Planning Issues. https://www.critical-chain-projects.com/the-method
- Junqueira, V.S.V., Nagano, M.S. and Miyata, H.H. (2020) Procedure Structuring for Programming Aircraft Maintenance Activities. Revista de Gestão, 27, 2-20. https://doi.org/10.1108/REGE-02-2018-0026
- Reményi, C. and Staudacher, S. (2014) Systematic Simulation Based Approach for the Identification and Implementation of a Scheduling Rule in the Aircraft Engine Maintenance. International Journal of Production Economics, 147, 94-107. https://doi.org/10.1016/j.ijpe.2012.10.022
- Kulkarni, A., Yadav, D.K. and Hamid Nikraz, H. (2017) Aircraft Maintenance Checks Using Critical Chain Project Path. Aircraft Engineering and Aerospace Technology, 89, 879-892. https://doi.org/10.1108/AEAT-10-2013-0186
- Atli, O. and Kahraman, C. (2012) Aircraft Maintenance Planning Using Fuzzy Critical Path Analysis. International Journal of Computational Intelligence Systems, 5, 553-567. https://doi.org/10.1080/18756891.2012.696920
- Balyuk, A. (2020) Student Syndrome in Project Management: Real Constraint or Just Human Factor? Epicflow. https://www.epicflow.com/blog/student-syndrome-in-project-management-real-constraint-or-just-human-factor/
- Goldratt, E. (1997) Critical Chain. North River Press Publishing Corporation, Great Barrington.
- Robinson, H. and Richards, R. (2010) Critical Chain Project Management: Motivation & Overview. Proceedings of 2010 IEEE Aerospace Conference, Big Sky, 6-13 March 2010, 1-10. https://doi.org/10.1109/AERO.2010.5446879 https://ieeexplore.ieee.org/document/5446879
- Seitza, M., Luchta, T., Kellerb, C., Ludwigc, C., Strobeltd, R. and Nyhuisa, P. (2020) Improving MRO Order Processing by Means of Advanced Technological Diagnostics and Data Mining Approaches. Procedia Manufacturing, 43, 688-695. https://doi.org/10.1016/j.promfg.2020.02.121
- Srinivasan, M.M., Best, W.D. and Chandrasekaran, S. (2007) Warner Robins Air Logistics Center Streamlines Aircraft Repair and Overhaul. Interfaces, 37, 7-21. https://doi.org/10.1287/inte.1060.0260
- Srinivasan, M.M. and Best, W.D. (2006) Back on the Runway: The United States Airforce Meets Critical Chain Project Management. APICS Magazine. http://realization.us/pdf/articles/Back-on-the-Runway.pdf
- Luiz, O.R., DeSouza, F.B., Luiz, J.V.R., Jugend, D. and Salgado, M.H. (2019) Impact of Critical Chain Project Management and Product Portfolio Management on New Product Development Performance. Journal of Business & Industrial Marketing, 34, 1692-1705. https://doi.org/10.1108/JBIM-11-2018-0327