Quantifying Operational Impacts of Variations in Work Zone Setups, Traffic Demand, and Traffic Composition: A Case Study
- 1 Department of Civil, Construction, and Environmental Engineering, University of Alabama at Birmingham, Birmingham, USA
- 2 Department of Civil, Construction, and Environmental Engineering, University of Alabama at Birmingham, Birmingham, USA
Abstract
The presence of work zones due to pavement repair and rehabilitation is very common in highway facilities. Lane closures associated with work zones result in capacity reduction, which, in turn, often leads to increased congestion at such locations. This paper documents findings from a study that investigated the performance of freeway facilities in the presence of work zones under various Temporary Traffic Control (TTC) and lane closure scenarios while taking under consideration traffic composition and driving behaviors. The study site was an approximately 10-mile freeway segment of Interstate 65 (I-65) located in Birmingham, AL. The testbed was coded in PTV VISSIM, a microscopic simulation analysis platform, for: 1 ) baseline conditions ( i.e ., no work zone presence) and 2 ) work zone conditions with single lane closure ( i.e ., 3-to-2 lane closure). Work zone scenarios were coded for two TTC strategies, namely, early merge and late merge control and for three different positions of the lane closure ( i.e ., left, right, and center lane closures). The length of the work zones varied from 1000 to 2000, and 3000 ft. Sensitivity analysis was performed to document the operational impacts of varying heavy vehicle percentages, changes in drivers’ aggressiveness, and projected traffic demand changes. The impacts were quantified using linked-based measures of effectiveness (MOEs) such as travel time, and travel time index. The study results show that there is no significant change in travel time index due to the variation of work zone length across the study corridor. Under similar traffic control and demand conditions, a center lane closure consistently results in significantly higher travel time index than a left or right lane closure and should be avoided. Consideration of operational impacts of changes in truck percentage indicates that the corridor can absorb an increase in truck percentage from 10% to 15%, while performance rapidly deteriorates when a higher percentage of trucks is present in the traffic stream. The study findings can be used to guide transportation agencies in their future efforts to develop strategic lane closure plans that minimize congestion.
- Wolff, G. (2007) Traffic Control Safety: Meeting the FHWA Minimums Is Not Enough. ASSE Professional Development Conference, Orlando, 24-27 June 2007, 1-10.
- Chitturi, M.V., Benekohal, R.F. and Kaja-Mohideen, A.-Z. (2008) Methodology for Computing Delay and User Costs in Work Zones. Transportation Research Record, 2055, 31-38. https://doi.org/10.3141/2055-04
- Nemeth, Z.A. and Rouphail, N.M. (1982) Lane Closures at Freeway Work Zones: Simulation Study. Transportation Research Record, 869, 19-25.
- Khattak, A.J., Khattak, A.J. and Council, F.M. (2002) Effects of Work Zone Presence on Injury and Non-Injury Crashes. Accident Analysis & Prevention, 34, 19-29. https://doi.org/10.1016/S0001-4575(00)00099-3
- Performance Measurement Development. FHWA Work Zone. https://ops.fhwa.dot.gov/wz/decision_support/performance-development.htm
- Ramadan, O.E. and Sisiopiku, V.P. (2018) Modeling Highway Performance under Various Short-Term Work Zone Configurations. Journal of Transportation Engineering, Part A: Systems, 144. https://doi.org/10.1061/JTEPBS.0000176
- Hadi, M., Sinha, P. and Wang, A. (2007) Modeling Reductions in Freeway Capacity due to Incidents in Microscopic Simulation Models. Transportation Research Record: Journal of the Transportation Research Board, 1999, 62-68. https://doi.org/10.3141/1999-07
- Ramadan, O. and Sisiopiku, V. (2015) Bottleneck Merge Control Strategies for Work Zones: Available Options and Current Practices. Open Journal of Civil Engineering, 5, 428-436. https://doi.org/10.4236/ojce.2015.54043
- Lammers-Staats, E., Pigman, J.G., Howell, B.K. and Kirk, A.J. (2018) Applicability of Zipper Merge versus Early Merge in Kentucky Work Zones. Kentucky Transportation Center, Lexington. https://uknowledge.uky.edu/ktc_researchreports/1593/
- Paolo, P. and Sar, D. (2012) Driving Speed Behaviour Approaching Road Work Zoneson Two-Lane Rural Roads. Procedia-Social and Behavioral Sciences, 53, 672-681. https://doi.org/10.1016/j.sbspro.2012.09.917
- Manual on Uniform Traffic Control Devices (MUTCD). https://mutcd.fhwa.dot.gov/
- von der Heiden, N. and Geistefeldt, J. (2016) Capacity of Freeway Work Zones in Germany. Transportation Research Procedia, 15, 233-244. https://doi.org/10.1016/j.trpro.2016.06.020
- Datta, T., Schattler, K. L., Guha, A., Kar, P. and Guha, A. (2004) Development and Evaluation of an Advanced Dynamic Lane Merge Traffic Control System for 3 to 2 Lane Transition Areas in Work Zones. Michigan Department of Transportation Construction & Technology Division, Lansing.