The repeated failures of any equipment or systems are modeled as a renewal process. The management needs an assessment of the number of future failures to allocate the resources needed for fast repairs. Based on the idea of expectation by conditioning, special Volterra-type integral equations are derived for general types of repairs, considering the length of repair and reduced degradation of the idle object. In addition to minimal repair and failure replacement, partial repairs are also discussed when the repair results in reduction of the number of future failures or decreases the effective age of the object. Numerical integration-based algorithm and simulation study are performed to solve the resulting integral equation. Since the geometry degradation in different dimensions of a rail track and controlling and maintaining defects are of importance, a numerical example using the rail industry data is conducted. Expected number of failures of different failure type modes in rail track is calculated within a two-year interval. Results show that within a two-year period, anticipated occurrences of cross level failures, surface failures, and DPI failures are 2.4, 3.8, and 5.8, respectively.
KeywordsRenewal TheoryExpected Number of FailuresPartial RepairMinimal Repair
Krupitzer, C., Wagenhals, T., Zufle, M., Lesch, V., Schafer, D., Mozaffarin, A., Edinger, J., Becker, C. and Kounev, C. (2020) A Survey on Predictive Maintenance for Industry 4.0. arXiv: 2002.08224.
Rebaiaia, M.L. and Ait-kadi, D. (2020) Maintenance Policies with Minimal Repair and Replacement on Failures: Analysis and Comparison. International Journal of Production Research , 59, 6995-7017. https://doi.org/10.1080/00207543.2020.1832275
Tanwar, M., Rai, R.N. and Bolia, N. (2014) Imperfect Repair Modeling Using Kijima Type Generalized Renewal Process. Reliability Engineering & System Safety , 124, 24-31. https://doi.org/10.1016/j.ress.2013.10.007
Kijima, M. and Nakagawa, T. (1991) A Cumulative Damage Shock Model with Imperfect Preventive Maintenance. Naval Research Logistics , 38, 145-156. https://doi.org/10.1002/1520-6750(199104)38:2 3.0.CO;2-D
Doyen, L. and Gaudoin, O. (2004) Classes of Imperfect Repair Models Based on Reduction of Failure Intensity or Virtual Age. Reliability Engineering & System Safety , 84, 45-56. https://doi.org/10.1016/S0951-8320(03)00173-X
Milton, J.C. and Arnold, J.C. (2003) Introduction to Probability and Statistics. McGraw Hill, Boston.
Ross, S. (2000) Introduction to Probability Models. 7th Edition, Academic Press, San Diego.
Cox, D. (1970) Renewal Theory. Methuen and Co., London.
Ross, S. (1996) Statistic Processes. Wiley, New York.
Barlow, R.E. and Proschan, F. (1965) Mathematical Theory of Reliability. John Wiley and Sons, New York.
Nakagawa, T. (2014) Random Maintenance Policies. Springer, London. https://doi.org/10.1007/978-1-4471-6575-0
Nakagawa, T. and Zhao, X. (2015) Maintenance Overtime Policies Is Reliability Theory, Models and Random Working Cycles. Springer, London. https://doi.org/10.1007/978-3-319-20813-8
Kaminisky, M. and Krivtsov, V. (2006) A Monte Carlo Approach to Estimation of G-Renewal Process in Warranty Data Analysis. Reliability Theory Application , 1, 29-31.
Yanez, M., Joglar, F. and Modarres, M. (2002) Generalized Renewal Process for Analysis of Repairable Systems with Limited Failure Experience. Reliability Eng i neering & System Safety , 77, 167-180. https://doi.org/10.1016/S0951-8320(02)00044-3
Xie, G., Buckingham, L., Cholette, M. and Ma, L. (2015) Calculation of the Expected Number of Failures for a Repairable Asset System. In: Tse, P., Mathew, J., Wong, K., Lam, R. and Ko, C., Eds., Engineering Asset Management - Systems , Professional Practices and Certification , Springer, Cham, 1727-1741. https://doi.org/10.1007/978-3-319-09507-3_148
Rahimikelarijani, B., Mohassel, A. and Hamidi, M. (2020) Railroad Track Geometric Degradation Analysis: A BNSF Case Study. Journal of Transportation Eng i neering , Part A : Systems , 146, Article 4019068. https://doi.org/10.1061/JTEPBS.0000303
Koutsellis, T., Mourelatos, Z.P. and Hu, Z. (2019) Numerical Estimation of Expected Number of Failures for Repairable Systems Using a Generalized Renewal Process Model. ASME Journal of Risk and Uncertainty in Engineering Systems , Part B : Mechanical Engineering , 5, Article 020904. https://doi.org/10.1115/1.4042848
Gao, T., Wang, Q., Yang, K., Yang, C., Wang, P. and He, Q. (2021) Estimation of Rail Renewal Period in Small Radius Curves: A Data and Mechanics Integrated Approach. Measurement , 185, Article 110038. https://doi.org/10.1016/j.measurement.2021.110038
Mohammadi, R. and He, Q. (2022) A Deep Reinforcement Learning Approach for Rail Renewal and Maintenance Planning . Reliability Engineering & System Safety , 225, Article 108615. https://doi.org/10.1016/j.ress.2022.108615
Maghsoodloo, S. and Helvaci, D. (2014) Renewal and Renewal-Intensity Functions with Minimal Repair. Journal of Quality and Reliability Engineering , 2014, Article ID: 857437. https://doi.org/10.1155/2014/857437
Ahmadi, R., Rasaei, Z. and Farnoosh, R. (2023) An Approach to Modeling Residual Life of a Renewal Process for Reliability Analysis and Maintenance Planning. Co m puters & Industrial Engineering , 183, Article 109510. https://doi.org/10.1016/j.cie.2023.109510
Paprocka, I., Kempa, W.M. and Skołud, B. (2021) Predictive Maintenance Scheduling with Reliability Characteristics Depending on the Phase of the Machine Life Cycle. Engineering Optimization, 53, 165-183. https://doi.org/10.1080/0305215X.2020.1714041
Chadjiconstantinidis, S. (2023) Some Bounds for the Renewal Function and the Variance of the Renewal Process. Applied Mathematics and Computation , 436, Article ID: 127497. https://doi.org/10.1016/j.amc.2022.127497
Jazi, E.M., Tavakkoli-Moghaddam, R. and Sangroudi, H.A. (2022) A Mathematical Model for Dynamic Scheduling of Production and Maintenance Activities in a Flexible Job-Shop System. 2022 6 th International Conference on System Reliability and Safety ( ICSRS ), Venice, 23-25 November 2022, 81-86. https://doi.org/10.1109/ICSRS56243.2022.10067415
Toosi, G. and Ahmadi, M.M. (2023) Robust Process Capability Indices for Multivariate Linear Profiles. 2023 Systems and Information Engineering Design Symp o sium ( SIEDS ), Charlottesville, 27-28 April 2023, 165-170. https://doi.org/10.1109/SIEDS58326.2023.10137780
Goodman, D., Hofmeister, J.P. and Szidarovszky, F. (2019) Prognostics and Health Management: A Practical Approach to Improving System Reliability Using Conditioned-Based Data. Wiley, Hoboken. https://doi.org/10.1002/9781119356677
Wang, J., Zhang, X., Zeng, J. and Zhang, Y. (2019) Optimal Dynamic Imperfect Preventive Maintenance of Wind Turbines Based on General Renewal Processes. International Journal of Production Research , 58, 6791-6810. https://doi.org/10.1080/00207543.2019.1685706
Yakowitz, S. and Szidarovszky, F. (1986) An Introduction to Numerical Computations. Macmillan Publishing, New York.
Arastehkhouy, I., Larsson-Kråik, P.O., Nissen, A. and Kumar, U. (2016) Cost-Effective Track Geometry Maintenance Limits. Proceedings of the Institution of M e chanical Engineers , Part F : Journal of Rail and Rapid Transit , 230, 611-622. https://doi.org/10.1177/0954409714542859