The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects.
- Chaudhari, A.N. and Shah, U. (2021) Evaluation of Quality Management System of Bridge Construction Projects. International Journal of Engineering Research & Technology , 10, 421-424.
- Tang, M. (2018) Forms and Aesthetics of Bridges. Engineering , 4, 267-276. https://doi.org/10.1016/j.eng.2017.12.013
- Zaeri, F. and Rotimi, J.O.B. (2014) The Power of Technology in Bridge Construction Project Management. Proceedings of the International Symposium on Aut o mation and Robotics in Construction ( IAARC ), Sydney, 9-11 July 2014, 987-994. https://doi.org/10.22260/isarc2014/0059
- Qin, S. (2022) Recent Hydraulic Bridge Failures in China: Review and Discussion. Revista de la construcción , 21, 193-203. https://doi.org/10.7764/rdlc.21.2.193
- Timilsina, S.P., Ojha, S.K. and Dhungana, B.R. (2020) Causes of Delay in Construction of Motorable Bridges under “Design and Build Model” of Bridge Project, Department of Roads, Nepal. Modern Economy , 11, 1451-1462. https://doi.org/10.4236/me.2020.118103
- Shah, K.J. and Apte, M.R. (2020) Causes of Delay in Construction of Bridge Girders. IOSR Journal of Mechanical and Civil Engineering , 12, 8-12.
- Ibrahim, J., Loch, C. and Sengupta, K. (2022) Two Bridge Projects. In: Ibrahim, J., Loch, C. and Sengupta, K., Eds., How Mega - Projects Are Damaging Nigeria and How to Fix It , Palgrave Macmillan, 137-148.
- Frederic, H. and Irechukwu, E.N. (2023) Factors Affecting Cost and Execution Pe-riod of Trail Bridge Construction Project in Nyamagabe District, Rwanda. Jou r nal of Entrepreneurship & Project Management , 7, 21-44. https://doi.org/10.53819/81018102t5192
- Chan, D.W.M. and Kumaraswamy, M.M. (1999) Factors Facilitating Faster Construction. Journal of Construction Procurement , 5, 88-98.
- Tafesse, S. (2021) A Review on the Critical Factors Causing Delay of Delivery Time in Construction Projects. International Journal of Engineering Technologies , 6, 69-81. https://doi.org/10.19072/ijet.815025
- Simon, S.M., Njuguna, B.M. and Kivaa, T.P. (2021) An Evaluation of the Organizational Performance of Local Contractors in Kenya. East African Journal of Eng i neering , 3, 46-66. https://doi.org/10.37284/eaje.3.1.289
- Shivachi, S.M., Nzulwa, J. and Kwena, R. (2019) Influence of Project Designs on the Success of Bridge Construction Projects in Kenya: A Case Study of Nairobi City County. Journal of International Business , Innovation and Strategic Management , 2, 31-46.