Abstract
The steel roof of Jiangmen gymnasium is the large-span spatial pipe truss structure, which is composed of main truss, secondary truss and stable truss. This paper systematically expounds the construction simulation analysis, the composition of the construction monitoring system, the monitoring method, and the arrangement of measuring points. The construction simulation analysis simulates the whole process of the main truss cumulative lifting installation, the secondary truss and auxiliary structure hoisting, and then the main truss for overall unloading, which is the difficulty of the whole project. The results of the structural construction monitoring show that the roof structure is in a safe state, and the fine construction simulation analysis provides a theoretical basis for the construction process, and the theoretical value of the simulation analysis is in good agreement with the measured data. In addition, vertical displacement and stress are obvious mutation s in the unloading stage of roof support, but the stress of each measuring point is in elastic working condition, which meets the design requirements, indicating the correctness of the model and method in construction simulation analysis and calculation, and also provide s reference for the design and construction of related projects in the future.
- Dong, S.L., Xing, D. and Zhao, Y. (2012) Application and Development of Modern Long-Span Space Structures in China. Spatial Structures, 18, 3-16.
- Dong, S.L. (2010) Development and Expectation of Spatial Structures in China. Journal of Building Structures, 31, 38-51.
- Lin, B., Cao, W., Dong, J.Y., Pei, S.Y. and Liang, S.Y. (2015) Installation Technology for Multi-Story Overweight and Long-Span Steel Truss of Hanzhou Internation Expo Center. Steel Construction, 30, 69-93.
- Xie, H.P., Jin, Z.C. and Luo, Z.L. (2017) Consturction of Large-Span Inclined Arch Pipe Truss Installation. Construction Technology, 46, 33-35.
- Liu, X.W., Guo, Y.L. and Guo, Y.F. (2010) Application of Jack Element Model for Numerical Simulation of Removing Temporary Supports of Large-span Steel Roof. Construction Technology, 39, 24-28, 33.
- Zong, Z.H., Wang, T.L., Huang, D. Z. and Zheng, Z.F. (2002) State-of-the-Art Report of Bridge Health Monitoring. Journal of Fuzhou University (Natural Science), 30, 127-153.
- Wang, X.L., Rong, Z.H., Yang, B.X., Luo, C.D., Zhou, Y. and Wu, X.Y. (2017) Whole Process Simulation Analysis and Health Monitoring of Spatial Pipe Truss Structure Gymnasinm. Journal of Architecture and Civil engineering, 34, 18-25.
- Qian, J.R. Zhang, W.J., Zhao, Z.Z., Pan, P., Zhong, C.L. and Jiang, Q.Z. (2009) Simulation and Monitoring for the Construction of the Steel Roof of the Peking University Gymnasium. China Civil Engineer Journal, 42, 13-20.
- Patrikar, A. and Pathak, K. (2016) Fully Stressed Design of Fink Truss Using STAAD. Pro Software. Open Journal of Civil Engineering, 6, 631-642. https://doi.org/10.4236/ojce.2016.64051
- Mesda, Y. (2013) Analytical Study of the Cable-Truss Systems on the Glass Certain Walls with Vertical Uses. Engineering, 5, 819-826. https://doi.org/10.4236/eng.2013.510099
- N YQ, Jian, S.F. and Ko, J.M. (2001) Application of Adaptive Probabilistic Neural Network to Damage Detection of Tsing Ma Bridge. Health Monitoring and Management of Civil Infrastrutures Systems, SPIE, USA, Vol. 4337, 347-356. https://doi.org/10.1117/12.435610
- Farrar, C.R., Duffey, T.A., Doebling, S.W., et al. (1999) A Statistical Pattern Recognition Paradigm for Vibration-Based Structural Health Monitoring. The 2nd International Workshop on Structural Health Monitoring, Stanford, CA, 245-257
- Zhou, G.G., Chen, X., Wang, Y.M., et al. (2010). Key Construction Technology for the Steel Truss with Large Cantilever on the Stadium of Nanchang International Sports Center. Construction Technology, 39, 78-81.